SmartGuard installation success hinges on three fundamentals: maintaining proper bend radius, setting compliant supports, and terminating with straight connectors using a disciplined sequence. The practices below align with typical NEC-informed guidelines used on DAS coax projects and are structured to streamline QA, testing, and final inspection. Windy City Wire SmartGuard offerings and datasheets are available at https://windycitywire.com/products/das/smartguard.
Bend Radius: Preserve Geometry, Prevent Loss For coax and armored assemblies, geometry is performance. Bends are planned as smooth sweeps, avoiding any sharp transitions that might deform the outer conductor or armor.
Coax bend radius: Follow the product datasheet for exact values. As a conservative field rule, permanent bends at ≥10× the cable OD protect return loss and minimize microbends.
SmartGuard armored assembly bend radius: Follow the assembly datasheet. A practical rule-of-thumb is ≥7× the overall OD for installed bends, with larger radii preferred where space permits.
No back-bending at the same point. If a bend is formed incorrectly, the section is cut back and remade.
Support sweeping turns with wide-radius hardware; corners are converted to arcs. Edge guards or bushings are used at tray rims and penetrations to prevent jacket or armor abrasion.
Service loops are formed with generous radii and secured at multiple points so the loop does not “neck” at a single tie location.
In cold conditions, allow acclimation before forming bends to avoid jacket crazing.
Supports: Spacing, Methods, and the Fishing Exception Consistent support spacing controls sag, protects bend radius, and simplifies inspection. Typical NEC-informed practices for communications/coax installations are applied:
Spacing: supports at intervals not exceeding 6 feet along the run.
Terminations: an additional support within 12 inches of each termination or device (e.g., BDAs, splitters/couplers/taps, loads, and antennas).
Fishing exception: when a cable is fished through concealed spaces, the support requirement is waived during the fishing operation. After the cable is placed and accessible, standard support spacing is restored.
Methods and hardware: wide-saddle J-hooks, listed straps on unistrut, or cable tray with radius accessories. Over-tightening is avoided; the outer conductor or armor must not be flattened or indented.
Prohibited supports: building systems not intended for cabling (e.g., ceiling grid wires, sprinkler piping) are not used as support points.
Separation and routing: separation from power systems, tray fill, and sidewall pressure limits are maintained in accordance with design and code. Penetrations are sleeved and firestopped to the required listing.
Connectors: Straight, Spec-Compliant Terminations Straight connectors are standard practice. Angle connectors are avoided because they concentrate stress at the transition, force tight bends adjacent to the port, and can negatively affect RF and PIM performance.
Connector callouts often used on SmartGuard armored entries include straight fittings such as GAR-DB75IC (confirm part compatibility with the specific cable OD and enclosure). For RF ends, use the specified interface (e.g., 4.3-10, N, 7/16 DIN) matched to the cable and system design.
A disciplined termination sequence improves consistency and reduces rework:
Square cut and prep
The cable is cut square without ovalizing. Edges are deburred lightly; the dielectric and foil are not nicked.
Strip to specification
Manufacturer strip dimensions and tools are used. The braid is dressed evenly; required foils remain intact per connector design.
Dry fit
Ferrule and body are test-fitted to confirm full seating and concentric alignment of the center conductor.
Assemble and secure
Compression or crimp is performed using the specified die set and stroke. Substitutions are avoided.
Torque
The coupling nut is torqued to the connector manufacturer’s spec using a calibrated wrench.
Strain relief and support
A support is installed within 12 inches of the termination to remove mechanical load from the port or fitting. Weatherproofing is applied where required (e.g., butyl followed by UV tape).
Test and label
DC continuity/shield checks are performed; sweep or PIM testing is completed where specified by the project. Terminations are labeled per as-built documentation.
Pulling and Routing: Set Up Once, Touch Once Pathways are prepared before the reel is placed. Supports are mounted at ≤6-foot intervals with pre-identified positions for the within-12-inch termination supports. Reels are dispensed on stands to prevent twist loading; swivels are used as needed. Pulling tension is kept within the cable’s maximum rating and bends are guided with rollers or sleeves to respect sidewall pressure. After both ends land, service loops are formed within radius limits, termination supports are added, and connectors are installed and tested.
Documentation and Closeout A concise closeout process improves approval speed:
Visual: bend radii observed, no kinks or flat spots, supports at ≤6 feet and within 12 inches of terminations, penetrations sealed.
Mechanical: armored entries fully captured and bonded at enclosures as required; no cable load on RF ports.
Electrical/RF: continuity and insulation checks complete; sweep/PIM results recorded where specified.
Records: routing notes, photos of terminations and supports, connector part numbers (e.g., GAR-DB75IC where used), and test summaries filed with as-builts.
Materials and Specifications SmartGuard product selections, compatible accessories, OD values for bend-radius calculations, and connector options are provided at Windy City Wire’s SmartGuard page: https://windycitywire.com/products/das/smartguard