How our DAS ROM/BOM Request Form streamlines your workload and de‑risks bids
Integrators juggle fast-moving schedules, incomplete drawings, shifting AHJ expectations, long-lead parts, and tight labor. The fastest way to tame that chaos is to standardize what matters up front.
That’s exactly why we built the DAS ROM/BOM Request Form—and why it’s the start of a smoother, faster, less risky path from plan submission to a build-ready solution.
The form is more than a submission link—it’s your process accelerator. It gathers the exact inputs our team needs to produce a clear, constructible, procurement-ready answer without days of back-and-forth.
What it does for you:
Reduces RFIs and change orders by capturing code, band, and scope details early
Speeds budgets and bids with aligned ROM/BOM outputs and stated assumptions
Aligns supply chain from day one so you see realistic alternates and lead times
Surfaces install risks (pathways, plenum, grounding, power) before they hit the field
Converts drawings into takeoffs, kitted materials, and phased deliveries that save labor
One-touch intake → clear outputs
You give us the essentials once. We
translate it into a complete ROM or BOM with assumptions and options clearly stated.
Fewer email threads → faster approvals
The form gathers scope and
constraints up front, so your estimating and PM teams can advance without clarifications dragging on.
Design sanity check → field-ready quotes
Our engineers validate loss
budgets, code notes, and constructability before you ever see pricing—cutting downstream rework.
Supply-chain reality → predictable procurement
We verify availability and
include approved alternates to avoid long-lead surprises.
Install-focused packaging → labor you can count on
Kitting, labeling, and
jobsite-smart packaging help foremen launch faster and reduce waste.
Intake + Scope Alignment
We review your form within our DAS queue, confirm
any gaps (bands, AHJ specifics, drawing scale), and align on ROM vs BOM expectations.
Plan Review + Site Context
We study materials, pathways, ceiling types,
and IDF/MDF layouts to ensure your solution is both compliant and buildable.
Architecture Selection
Passive, active, or hybrid—driven by performance,
capacity, and budget. We model loss and power to meet KPIs in the real world.
Material Strategy
Coax, fiber, antennas, passives, grounding, hardware,
labeling. We balance RF performance, code requirements, availability, and install speed.
Value Engineering
We reduce antenna density where possible, right-size
cable types, and recommend in-stock alternates to protect schedule and budget.
Internal QA
A second set of eyes checks scope, performance,
constructability, and compliance before anything reaches your inbox.
Delivery + Walkthrough
You get a clear ROM or a procurement-ready BOM—and
we walk you through inclusions, options, assumptions, and next steps.
ROM (Rough Order of Magnitude)
Budgetary range with clearly stated assumptions
Early takeoffs and materials framework
Schedule/risk flags and VE opportunities
Ideal for bids, funding, and early design alignment
BOM (Bill of Materials)
Procurement-ready line items with part numbers and quantities
Cable length takeoffs by area/pathway and all accessories
Compliance notes for AHJ/carriers and installation considerations
Options for kitting, labeling, and phased jobsite deliveries
Clear scope boundaries mean fewer change orders
Documented assumptions protect your bid position
Alternatives vetted for availability keep you on schedule
Install-focused packaging reduces on-site labor and scrap
Early code alignment shortens submittal cycles
Public Safety retrofit, mixed construction
The form flags AHJ requirements
and survivability needs so we propose compliant components and pathways the first time.
Multi-tenant commercial building with partial drawings
We convert
preliminary plans into a phased ROM and call out missing items, letting you secure budget while design
finalizes.
Greenfield with tight schedule
We prioritize in-stock materials and
pre-kitting options to accelerate rough-in and keep crews productive.
A clear ROM or a detailed, procurement-ready BOM
Cable takeoffs, loss/performance notes, and compliance callouts
Identified risks with mitigation options and viable alternates
Optional kitting/labeling plans and logistics aligned to your schedule
Scaled floor plans (PDF/CAD) and a riser diagram
Construction notes by area (concrete, curtain wall, plenum type)
IDF/MDF locations, available power, grounding points
Target bands or AHJ/carrier guidance (if available)
Key dates and whether you need a ROM or BOM
Do you have everything? Submit what you can—the form helps us close the gaps quickly.
Start with the WCW DAS ROM/BOM Request Form. It’s the fastest route to a clear, buildable, and procurement-ready solution.
Submit your project:
https://windycitywire.com/das/rom-bom-request-form
Prefer a quick alignment call first, contact one of our DAS specialists